Some of Billitier’s Projects in Detail
Shadow Lake Golf & Racquet Club Fire repair and renovation to existing clubhouse. More images from this project.
Rochester General Hospital - Sands Constellation Addition New 9-Story Hospital Building More images from this project.
del Lago Resort & Casino Brand new casino, hotel & spa. More images from this project.
Bill Gray's Regional Iceplex LED lighting replacement in rinks and parking lot. More images from this project.
Ralph Wilson Stadium: Buffalo Bills Field House Replace 300 existing metal halide fixtures with 200 new LED fixtures and all dimming controls. More images from this project.
Corning-Painted Post East High School Renovation of existing facility, plus 120,000 sq. ft. addition. Renovation includes remodeling the existing auditorium into a kitchen/cafeteria, the existing kitchen into classrooms, and the existing gymnasium into an auditorium. More images from this project.
Morton Salt Victor CSD Community Pool CMAC's Marvin Sands Performing Arts Center Emergency Generator A new 60KW emergency generator system was added to the existing incoming power infrastructure. This will provide emergency backup power to nearby buildings, concession area, restrooms, and lighting outside the main shell during events, to provide customer safety and convenience. More images from this project.
Ontario County NY County Courthouse Project
Replacement of fire alarm system. Unity Hospital Modernization & Expansion Project Partial remodel and new build. New installation of fire alarm, power and lighting for patient rooms, nurse stations, kitchen, loading dock area and main entrance concourse. Scope includes 8 total floors: 2nd and 3rd floor patient room demolition and rebuild; brand new 4th floor patient rooms, nurse stations; 5th floor penthouse mechanicals. More images from this project.
L3 Harris Technologies: Henrietta Complete remodel of Henrietta facility for use by new L3 Harris Technologies branch. More images from this project.
Zeller Corporation Headquarters Renovation of existing Gleason Building to house Zeller headquarters. Wegmans Market Street Cooling tower upgrade to Wegmans corporate offices. More images from this project.
University of Rochester CTSB: Saunders Research Building New 200,000 Sq Ft Building More images from this project.
Bausch & Lomb - New RD Backup Generator New 750,000 Watt Generator to provide back-up power for B&L’s new 75,000 SQ FT R&D Facility. Prism Electrical Relocations Underground Vault Construction of a new 3,200 square foot underground vault to house 5KV/15KV distribution gear. The project included demolition, relocations, and addition of medium voltage circuits as well as feeding the existing hospital, and future building. We also relocated all power, lighting, fire alarm and paging in the existing underground pedestrian tunnel to the newly constructed tunnel portion, which will now serve this vault. More images from this project.
Unity Health Living Centers Construction of five new buidlings, one of which is attached to the existing hospital. Project included all electrical work including tie ins to the existing, occupied hospital James P. Wilmot Cancer Center Vertical Expansion Vertical expansion of existing Cancer Center More images from this project.
Gates Chili Central School District Additional buildings and renovation of existing school buildings including new gymnasium and pool. Eastman School of Music Chiller Package Infrastructure Upgrade for New Chiller More images from this project.
Hampton Inn: Webster & Rochester Locations All electrical requirements for a four story, 90 room luxury hotel. New Wilmot Cancer Center One of the northeast’s newest and largest cancer treatment/R&D facility on the U Of R Campus. Also includes a dedicated breast care area. More images from this project.
Meliora Lab Renovation and 1st & 2nd Floor Infrastucture Lab Renovation, Infrastructure Upgrade (including new 250kW Generator) Eastman Theater Front of House Renovation 2008 Infrastructure Upgrade for Front of House Renovation U Of R - University Health Services Building New, 3-Story, Appoximately 20,000 SQ FT building to take care of on-site students health needs. Located in the U of R River Campus. Black & Blue Steak & Crab Upscale Steak/Seafood restaurant in Pittsford NY, featuring 2-Level dining, raw oyster bar, large wine wall, and private dining areas. More images from this project.
Ortho-Clinical Diagnostics / Johnson & Johnson FA Renovation Completely new fire alarm and pre-action systems in the Ortho-Clinical Bldg 313 location.
Penfield, New York
Fritz Odenbach / Gary Haseley
Club House, Restaurant, Bar, Banquet Room
April 2019
Matt Pfeffer
Hanlon Architects
Rochester, New York
Rochester General Hospital
New 9-story hospital building fitted with 23 operating rooms and 108 patient rooms.
December 2020
Jesse Giamartino
M/E Engineering
The 4 generators where 1000′ from the electric room. Installed 7 runs of 1000MCM to each and used a culvert as a manhole in the middle of the run.
Waterloo, New York
Wilmorite
Casino, 205-room hotel and spa, parking garage (approximate project cost $450M)
July 2017
Jesse Giamartino
Brighton, New York
Bill Gray’s Regional Iceplex
Multi-Rink Tournament Ice Skating/Hockey Facility
January of 2017
Matt Pfeffer
Billitier performed a replacement of all lighting in (4) rinks with new LED lighting, along with RGBW computerized color changing capability in one rink. We also replaced all exterior lighting with LED, and incorporated intelligent controls throughout rinks and exterior. this project was completed while rink was in full operation, without disruption to very busy skating/tournamet schedules. The customer will save thousands in energy costs and maintenance.
Orchard Park, NY
Erie County – Buffalo Bills
Field House / Training Facility
September of 2014
Matt Pfeffer
Watts Architecture/Engineering
This project was performed between summer activities and the first pre-season game, at heights of up to 110′, in 6 weeks. the entire control system was also replaced, along with all circuit wiring. The project received NYSERDA rebate incentives and dramatically improved the light quality and levels inside the facility
Corning, NY
Corning Central School District
Public School
August of 2014
Richard Lincourt
Hunt Engineers Architects Surveyors
This renovation project is being completed while school is in session and therefore requires specific cooperation and scheduling across all parties.
Silver Springs, NY
Morton Salt, Inc.
Mineral Mining and Processing Plant
Ongoing
Richard Lincourt
Victor, NY
Victor Central School District
Public School
August 2014
Tom Callen
The architetural design of the pool required unique electrical adaptations to comply with the overall appearance and functionality of the structure.
Canandaigua, NY
Ontario County
Theatre/Auditorium
Matt Pfeffer
TY-Lin
Victor, NY
Ontario County / Honeywell
Courthouse / Offices / Conference rooms
August 2015
Matt Pfeffer
This project consisted of a complete replacement of the existing fire alarm system and bringing the building, which was built in 1858, up to current fire code. The project was completed while the entire building was still in 100% operation and occupied. The existing fire alarm system from a different manufacturer was removed, new devices were installed, and entire control panel system was replaced. It was completed in approximately 5 weeks.
Rochester, NY
Unity Health System
Community Hospital
Spring of 2014
Jesse Giamartino
Gardner Plus Architects, PLLC
M/E Engineering
Being a working hospital, all contractor coordination must be done through both the GC and the owner.
Henrietta, NY
L3 Harris Technologies
Production Plant
January 2011
Tom Callen
SWBR Architects
M/E Engineering
Complete renovation of a 600,000 sq ft Manufacturing Facility in 10-month time frame.
Rochester, NY
The Zeller Corporation
Office/Manufacturing
2010
Matt Pfeffer
FRA Engineering (T.Y. Lin International Group)
Project was part of an existing 100-year-old building which required many updates before project could begin, all while attaining an impressive LEED Silver Certification upon completion.
Rochester, NY
Wegmans Food Markets
Corporate Offices
September 2011
Tom Avangelista
New cooling tower needed to be hooked into existing emergency power, all while facility was operational. Required coordination with mechanical trade. Control work required additional design build on the spot.
Rochester, NY
LeChase Construction
Office/Research Facility
March 2011
Matt Pfeffer
Francis Cauffman
Bard, Rao + Athanas Consulting Engineers
The U of R CTSB is a USGBC Gold certified LEED project. This project was one of the Univesity of Rochester’s first high end LEED certified projects, and designed around LEED criteria to the fullest extent possible. It was built to serve as a model for future LEED buildings at the campus. Click here for more information on what Billitier is doing with green projects.
Rochester, NY
Bausch & Lomb
Research & Development; combined manufacturing/office space
Fall of 2006
Matt Pfeffer
M/E Engineering
Rochester, NY
University Of Rochester
Future Research Building; combined manufacturing/office space
March 2010
Matt Pfeffer
SWBR Architects
Ballinger
By working hand in hand with the University’s electrical group, Billitier removed, relocated, and added medium voltage circuits feeding various parts of the campus, and Med Center. All work was completed during working hours without disruption to owner.
Rochester, NY
Unity Health System
Senior Living/Transitional Care Facility
March 2010
Matt Pfeffer
Gardner Plus Architects, PLLC
M/E Engineering
This job was to take the place of the existing facilities and had to be timed so a smooth transition between areas as accomplished.
Rochester, NY
University of Rochester
Health Care
July 2012
Matt Pfeffer
SWBR Architects
Ballinger
This project incorporates a 100,000sq ft expansion to the existing Cancer Center, while the building was in full operation. 2 new 11,500 volt substations were added to the infrastructure to accommodate the additional needs, along with many other very significant enhancements to the original building. This was done while keeping the occupants shielded from construction activities. This has helped to improve the comprehensive cancer care and cutting-edge research that the James P Wilmot Cancer Center is famous for. The new inpatient floors, treating Blood and Marrow Transplant (BMT) patients and adult hematology/oncology patients, feature vastly upgraded patient and family amenities, all designed to align with their commitment to patient and family centered care.
Rochester, NY
Gates Chili Central School District
School
December 2008
Rick Lincourt
LaBella Associates
Rochester, NY
University of Rochester
Music School, Practice Facilities
September 2008
Dan Bamann
Chaintreuil, Jensen, Stark LLC
M/E Engineering
Complex coordination with a very tight schedule made this one of the toughest projects in Rochester for the Summer of 2008.
Rochester, NY
Christa Construction
Hotel
December 2008
Thomas Avangelista
Bounds & Gillespie Architects, LLC
James W. Burns
Rochester, NY
University Of Rochester
Health Care
May 2008
Matt Pfeffer
SWBR Architects
M/E Engineering
Rochester, NY
University of Rochester
Office, Labs
October 2008
Dan Bamann
King & King
M/E Engineering
Close coordination with mechanical trades while building spaces were occupied was critical to complete work and allow occupants to maintain operation.
Rochester, NY
University of Rochester
Theater
September 2008
Dan Bamann
Chaintreuil, Jensen, Stark LLC
M/E Engineering
Complex coordination with a very tight schedule made this one of the toughest projects in Rochester for the Summer of 2008.
Rochester, NY
University of Rochester
Health Services
Summer 2008
Matt Pfeffer
SWBR Architects
M/E Engineering
Rochester, NY
Black & Blue Steak & Crab
Restaurant
Matt Pfeffer
Rochester, NY
Ortho-Clinical Diagnostics, Johnson & Johnson
Laboratory, Manufacturing, Office Space
February 2009
Matt Pfeffer
Erdman Anthony
Erdman Anthony
This job was performed while the building was completey occupied, and the existing fire alarm systems fully functional.