Electrical Projects

Some of Billitier’s Projects in Detail

Shadow Lake Golf & Racquet Club

Fire repair and renovation to existing clubhouse.

    • Location:
      Penfield, New York
    • Customer:
      Fritz Odenbach / Gary Haseley
    • Type of Building:
      Club House, Restaurant, Bar, Banquet Room
    • Date of Completion:
      April 2019
    • Project Manager:
      Matt Pfeffer
    • Architect:
      Hanlon Architects
    • Special Project Aspects/Challenges: Repairs and updates to lighting/power systems throughout the bar, event space, and kitchen area. All lighting upgraded to LED and updated for a more modern look.

More images from this project.


 

Rochester General Hospital - Sands Constellation Addition

New 9-Story Hospital Building

    • Location:
      Rochester, New York
    • Customer:
      Rochester General Hospital
    • Type of Building:
      New 9-story hospital building fitted with 23 operating rooms and 108 patient rooms.
    • Date of Completion:
      December 2020
    • Project Manager:
      Jesse Giamartino
    • Engineer:
      M/E Engineering
    • Special Project Aspects/Challenges:
      The 4 generators where 1000′ from the electric room. Installed 7 runs of 1000MCM to each and used a culvert as a manhole in the middle of the run.

More images from this project.


 

del Lago Resort & Casino

Brand new casino, hotel & spa.

    • Location:
      Waterloo, New York
    • Customer:
      Wilmorite
    • Type of Building:
      Casino, 205-room hotel and spa, parking garage (approximate project cost $450M)
    • Date of Completion:
      July 2017
    • Project Manager:
      Jesse Giamartino
    • Engineer: M/E Engineering
    • Special Project Aspects/Challenges: The project had an accelerated schedule; one-year build time for the garage and casino portion.

More images from this project.


 

Bill Gray's Regional Iceplex

AADSC00552C_sm

LED lighting replacement in rinks and parking lot.

    • Location:
      Brighton, New York
    • Customer:
      Bill Gray’s Regional Iceplex
    • Type of Building:
      Multi-Rink Tournament Ice Skating/Hockey Facility
    • Date of Completion:
      January of 2017
    • Project Manager:
      Matt Pfeffer
    • Engineer: Jacomb Lighting
    • Special Project Aspects/Challenges:
      Billitier performed a replacement of all lighting in (4) rinks with new LED lighting, along with RGBW computerized color changing capability in one rink. We also replaced all exterior lighting with LED, and incorporated intelligent controls throughout rinks and exterior. this project was completed while rink was in full operation, without disruption to very busy skating/tournamet schedules. The customer will save thousands in energy costs and maintenance.

More images from this project.


 

Ralph Wilson Stadium: Buffalo Bills Field House

AADSC00552C_sm

Replace 300 existing metal halide fixtures with 200 new LED fixtures and all dimming controls.

    • Location:
      Orchard Park, NY
    • Customer:
      Erie County – Buffalo Bills
    • Type of Building:
      Field House / Training Facility
    • Date of Completion:
      September of 2014
    • Project Manager:
      Matt Pfeffer
    • Architect:
      Watts Architecture/Engineering
    • Engineer: Didonato Engineering & Design
    • Special Project Aspects/Challenges:
      This project was performed between summer activities and the first pre-season game, at heights of up to 110′, in 6 weeks. the entire control system was also replaced, along with all circuit wiring. The project received NYSERDA rebate incentives and dramatically improved the light quality and levels inside the facility

More images from this project.

AADSC00530B_sm


 

Corning-Painted Post East High School


AADSC00552C_sm

Renovation of existing facility, plus 120,000 sq. ft. addition. Renovation includes remodeling the existing auditorium into a kitchen/cafeteria, the existing kitchen into classrooms, and the existing gymnasium into an auditorium.

    • Location:
      Corning, NY
    • Customer:
      Corning Central School District
    • Type of Building:
      Public School
    • Estimated Date of Completion:
      August of 2014
    • Project Manager:
      Richard Lincourt
    • Architect:
      Hunt Engineers Architects Surveyors
    • Special Project Aspects/Challenges:
      This renovation project is being completed while school is in session and therefore requires specific cooperation and scheduling across all parties.

More images from this project.

AADSC00530B_sm
AADSC00538B_sm
AADSC00570B_sm
AADSC00566B_sm
AADSC00553B_sm


 

Morton Salt

Ongoing electric updates and maintenance; projects spanning from $2,000 to $125,000.

  • Location:
    Silver Springs, NY
  • Customer:
    Morton Salt, Inc.
  • Type of Building:
    Mineral Mining and Processing Plant
  • Estimated Date of Completion:
    Ongoing
  • Project Manager:
    Richard Lincourt

 

Victor CSD Community Pool

Renovations and addition of community pool.

  • Location:
    Victor, NY
  • Customer:
    Victor Central School District
  • Type of Building:
    Public School
  • Estimated Date of Completion:
    August 2014
  • Project Manager:
    Tom Callen
  • Special Project Aspects/Challenges:
    The architetural design of the pool required unique electrical adaptations to comply with the overall appearance and functionality of the structure.

 

CMAC's Marvin Sands Performing Arts Center Emergency Generator

CMAC's Marvin Sands Performing Arts Center Emergency Generator

A new 60KW emergency generator system was added to the existing incoming power infrastructure. This will provide emergency backup power to nearby buildings, concession area, restrooms, and lighting outside the main shell during events, to provide customer safety and convenience.

  • Location:
    Canandaigua, NY
  • Customer:
    Ontario County
  • Type of Building:
    Theatre/Auditorium
  • Project Manager:
    Matt Pfeffer
  • Engineer:
    TY-Lin

More images from this project.

CMAC 1


 

Ontario County NY County Courthouse Project

Ontario County NY County Courthouse Project

Replacement of fire alarm system.

  • Location:
    Victor, NY
  • Customer:
    Ontario County / Honeywell
  • Type of Building:
    Courthouse / Offices / Conference rooms
  • Estimated Date of Completion:
    August 2015
  • Project Manager:
    Matt Pfeffer
  • Special Project Aspects/Challenges:
    This project consisted of a complete replacement of the existing fire alarm system and bringing the building, which was built in 1858, up to current fire code. The project was completed while the entire building was still in 100% operation and occupied. The existing fire alarm system from a different manufacturer was removed, new devices were installed, and entire control panel system was replaced. It was completed in approximately 5 weeks.

 

Unity Hospital Modernization & Expansion Project

Unity Hospital Modernization & Expansion Project

Partial remodel and new build. New installation of fire alarm, power and lighting for patient rooms, nurse stations, kitchen, loading dock area and main entrance concourse. Scope includes 8 total floors: 2nd and 3rd floor patient room demolition and rebuild; brand new 4th floor patient rooms, nurse stations; 5th floor penthouse mechanicals.

  • Location:
    Rochester, NY
  • Customer:
    Unity Health System
  • Type of Building:
    Community Hospital
  • Estimated Date of Completion:
    Spring of 2014
  • Project Manager:
    Jesse Giamartino
  • Architect:
    Gardner Plus Architects, PLLC
  • Engineer:
    M/E Engineering
  • Special Project Aspects/Challenges:
    Being a working hospital, all contractor coordination must be done through both the GC and the owner.

More images from this project.

unity4 unity3 Unity Hospital Modernization & Expansion Project


 

L3 Harris Technologies: Henrietta

L3 Harris Technologies Henrietta NY

Complete remodel of Henrietta facility for use by new L3 Harris Technologies branch.

  • Location:
    Henrietta, NY
  • Customer:
    L3 Harris Technologies
  • Type of Building:
    Production Plant
  • Date of Completion:
    January 2011
  • Project Manager:
    Tom Callen
  • Architect:
    SWBR Architects
  • Engineer:
    M/E Engineering
  • Special Project Aspects/Challenges:
    Complete renovation of a 600,000 sq ft Manufacturing Facility in 10-month time frame.

More images from this project.


harris4harris2harris3


 

Zeller Corporation Headquarters

Renovation of existing Gleason Building to house Zeller headquarters.

  • Location:
    Rochester, NY
  • Customer:
    The Zeller Corporation
  • Type of Building:
    Office/Manufacturing
  • Date of Completion:
    2010
  • Project Manager:
    Matt Pfeffer
  • Engineer:
    FRA Engineering (T.Y. Lin International Group)
  • Special Project Aspects/Challenges:
    Project was part of an existing 100-year-old building which required many updates before project could begin, all while attaining an impressive LEED Silver Certification upon completion.

 

Wegmans Market Street

Wegmans Market Street

Cooling tower upgrade to Wegmans corporate offices.

  • Location:
    Rochester, NY
  • Customer:
    Wegmans Food Markets
  • Type of Building:
    Corporate Offices
  • Date of Completion:
    September 2011
  • Project Manager:
    Tom Avangelista
  • Special Project Aspects/Challenges:
    New cooling tower needed to be hooked into existing emergency power, all while facility was operational. Required coordination with mechanical trade. Control work required additional design build on the spot.

More images from this project.

Wegmans Market Street wegmans3 wegmans4


 

University of Rochester CTSB: Saunders Research Building

University of Rochester - Saunders Research Building

New 200,000 Sq Ft Building

  • Location:
    Rochester, NY
  • Customer:
    LeChase Construction
  • Type of Building:
    Office/Research Facility
  • Date of Completion:
    March 2011
  • Project Manager:
    Matt Pfeffer
  • Architect:
    Francis Cauffman
  • Engineer:
    Bard, Rao + Athanas Consulting Engineers
  • Special Project Aspects/Challenges:
    The U of R CTSB is a USGBC Gold certified LEED project. This project was one of the Univesity of Rochester’s first high end LEED certified projects, and designed around LEED criteria to the fullest extent possible. It was built to serve as a model for future LEED buildings at the campus. Click here for more information on what Billitier is doing with green projects.

More images from this project.

University of Rochester - Saunders Research Building ctsb3 ctsb4


 

Bausch & Lomb - New RD Backup Generator

New 750,000 Watt Generator to provide back-up power for B&L’s new 75,000 SQ FT R&D Facility.

  • Location:
    Rochester, NY
  • Customer:
    Bausch & Lomb
  • Type of Building:
    Research & Development; combined manufacturing/office space
  • Date of Completion:
    Fall of 2006
  • Project Manager:
    Matt Pfeffer
  • Engineer:
    M/E Engineering

 

Prism Electrical Relocations Underground Vault

Construction of a new 3,200 square foot underground vault to house 5KV/15KV distribution gear. The project included demolition, relocations, and addition of medium voltage circuits as well as feeding the existing hospital, and future building. We also relocated all power, lighting, fire alarm and paging in the existing underground pedestrian tunnel to the newly constructed tunnel portion, which will now serve this vault.

  • Location:
    Rochester, NY
  • Customer:
    University Of Rochester
  • Type of Building:
    Future Research Building; combined manufacturing/office space
  • Date of Completion:
    March 2010
  • Project Manager:
    Matt Pfeffer
  • Architect:
    SWBR Architects
  • Engineer:
    Ballinger
  • Special Project Aspects/Challenges:
    By working hand in hand with the University’s electrical group, Billitier removed, relocated, and added medium voltage circuits feeding various parts of the campus, and Med Center. All work was completed during working hours without disruption to owner.

More images from this project.

Prism Electrical Relocations Underground Vault

IMAG0073a


 

Unity Health Living Centers

Construction of five new buidlings, one of which is attached to the existing hospital. Project included all electrical work including tie ins to the existing, occupied hospital

  • Location:
    Rochester, NY
  • Customer:
    Unity Health System
  • Type of Building:
    Senior Living/Transitional Care Facility
  • Date of Completion:
    March 2010
  • Project Manager:
    Matt Pfeffer
  • Architect:
    Gardner Plus Architects, PLLC
  • Engineer:
    M/E Engineering
  • Special Project Aspects/Challenges:
    This job was to take the place of the existing facilities and had to be timed so a smooth transition between areas as accomplished.

 

James P. Wilmot Cancer Center Vertical Expansion

Vertical expansion of existing Cancer Center

  • Location:
    Rochester, NY
  • Customer:
    University of Rochester
  • Type of Building:
    Health Care
  • Date of Completion:
    July 2012
  • Project Manager:
    Matt Pfeffer
  • Architect:
    SWBR Architects
  • Engineer:
    Ballinger
  • Special Project Aspects/Challenges:
    This project incorporates a 100,000sq ft expansion to the existing Cancer Center, while the building was in full operation. 2 new 11,500 volt substations were added to the infrastructure to accommodate the additional needs, along with many other very significant enhancements to the original building. This was done while keeping the occupants shielded from construction activities. This has helped to improve the comprehensive cancer care and cutting-edge research that the James P Wilmot Cancer Center is famous for. The new inpatient floors, treating Blood and Marrow Transplant (BMT) patients and adult hematology/oncology patients, feature vastly upgraded patient and family amenities, all designed to align with their commitment to patient and family centered care.

More images from this project.

2011-08-19 resizebreast-center-waiting-area


 

Gates Chili Central School District

Additional buildings and renovation of existing school buildings including new gymnasium and pool.

  • Location:
    Rochester, NY
  • Customer:
    Gates Chili Central School District
  • Type of Building:
    School
  • Date of Completion:
    December 2008
  • Project Manager:
    Rick Lincourt
  • Architect:
    LaBella Associates

 

Eastman School of Music Chiller Package

eastman2

Infrastructure Upgrade for New Chiller

  • Location:
    Rochester, NY
  • Customer:
    University of Rochester
  • Type of Building:
    Music School, Practice Facilities
  • Date of Completion:
    September 2008
  • Project Manager:
    Dan Bamann
  • Architect:
    Chaintreuil, Jensen, Stark LLC
  • Engineer:
    M/E Engineering
  • Special Project Aspects/Challenges:
    Complex coordination with a very tight schedule made this one of the toughest projects in Rochester for the Summer of 2008.

More images from this project.

eastman1eastman3

eastman4


 

Hampton Inn: Webster & Rochester Locations

All electrical requirements for a four story, 90 room luxury hotel.

  • Location:
    Rochester, NY
  • Customer:
    Christa Construction
  • Type of Building:
    Hotel
  • Date of Completion:
    December 2008
  • Project Manager:
    Thomas Avangelista
  • Architect:
    Bounds & Gillespie Architects, LLC
  • Engineer:
    James W. Burns

 

New Wilmot Cancer Center

One of the northeast’s newest and largest cancer treatment/R&D facility on the U Of R Campus. Also includes a dedicated breast care area.

  • Location:
    Rochester, NY
  • Customer:
    University Of Rochester
  • Type of Building:
    Health Care
  • Date of Completion:
    May 2008
  • Project Manager:
    Matt Pfeffer
  • Architect:
    SWBR Architects
  • Engineer:
    M/E Engineering

More images from this project.

trilogy


 

Meliora Lab Renovation and 1st & 2nd Floor Infrastucture

Lab Renovation, Infrastructure Upgrade (including new 250kW Generator)

  • Location:
    Rochester, NY
  • Customer:
    University of Rochester
  • Type of Building:
    Office, Labs
  • Date of Completion:
    October 2008
  • Project Manager:
    Dan Bamann
  • Architect:
    King & King
  • Engineer:
    M/E Engineering
  • Special Project Aspects/Challenges:
    Close coordination with mechanical trades while building spaces were occupied was critical to complete work and allow occupants to maintain operation.

 

Eastman Theater Front of House Renovation 2008

Infrastructure Upgrade for Front of House Renovation

  • Location:
    Rochester, NY
  • Customer:
    University of Rochester
  • Type of Building:
    Theater
  • Date of Completion:
    September 2008
  • Project Manager:
    Dan Bamann
  • Architect:
    Chaintreuil, Jensen, Stark LLC
  • Engineer:
    M/E Engineering
  • Special Project Aspects/Challenges:
    Complex coordination with a very tight schedule made this one of the toughest projects in Rochester for the Summer of 2008.

 

U Of R - University Health Services Building

New, 3-Story, Appoximately 20,000 SQ FT building to take care of on-site students health needs. Located in the U of R River Campus.

  • Location:
    Rochester, NY
  • Customer:
    University of Rochester
  • Type of Building:
    Health Services
  • Date of Completion:
    Summer 2008
  • Project Manager:
    Matt Pfeffer
  • Architect:
    SWBR Architects
  • Engineer:
    M/E Engineering

 

Black & Blue Steak & Crab

Upscale Steak/Seafood restaurant in Pittsford NY, featuring 2-Level dining, raw oyster bar, large wine wall, and private dining areas.

  • Location:
    Rochester, NY
  • Customer:
    Black & Blue Steak & Crab
  • Type of Building:
    Restaurant
  • Project Manager:
    Matt Pfeffer

More images from this project.

Black & Blue Steak House


 

Ortho-Clinical Diagnostics / Johnson & Johnson FA Renovation

Completely new fire alarm and pre-action systems in the Ortho-Clinical Bldg 313 location.

  • Location:
    Rochester, NY
  • Customer:
    Ortho-Clinical Diagnostics, Johnson & Johnson
  • Type of Building:
    Laboratory, Manufacturing, Office Space
  • Date of Completion:
    February 2009
  • Project Manager:
    Matt Pfeffer
  • Architect:
    Erdman Anthony
  • Engineer:
    Erdman Anthony
  • Special Project Aspects/Challenges:
    This job was performed while the building was completey occupied, and the existing fire alarm systems fully functional.